WSOR Baraboo River Bridge #4


Click the photo to view the full-size version

1/16
Date Taken:
Author:
Caption:

Name WSOR Baraboo River Bridge #4
Chicago & North Western Railway Bridge #398
Built By Chicago & North Western Railway
Currently Owned By State of Wisconsin (Operated by Wisconsin & Southern Railroad)
Superstructure Contractor Lassig Bridge & Iron Works of Chicago
Length 182 Feet Total, 81 Foot Largest Span
Width 1 Track, Formerly 2 Tracks
Height Above Ground 25 Feet (Estimated)
Superstructure Design Deck Plate Girder
Substructure Design Stone Masonry
Date Built 1899
Traffic Count 1 Train/Day (Estimated)
Current Status In Use
Chicago & North Western Railway Bridge Number 398
Wisconsin & Southern Railroad Bridge Number 398
Significance Local Significance
Documentation Date 3/25/2016; 1/7/2017

In 1860, the Beloit and Madison Railroad (B&M) constructed 17 miles of railroad, extending from Beloit, Wisconsin to Magnolia, Wisconsin.  In 1864, the B&M constructed an additional 32 miles of railroad, extending from Magnolia to Madison, Wisconsin.  In 1864, the Madison, Lodi and Baraboo Railroad (ML&B) began grading for a new railroad line, extending from Baraboo, Wisconsin to Merrimac, Wisconsin.  The ML&B was acquired by the Baraboo Air Line Railroad (BAL) in 1870, and began construction on a line extending from Reedsburg, Wisconsin to Madison.  In 1870, the La Crosse, Trempealeau and Prescott Railroad (LCT&P) constructed an additional 29 miles of railroad, extending from the Winona & St. Peter Railroad (W&StP) at Winona, Minnesota to the north side of La Crosse, Wisconsin; constructing a large bridge across the Mississippi River.  The BA&L and the B&M were acquired by the Chicago & North Western Railway (C&NW) in 1871.  The C&NW continued construction, eventually opening a 129 mile line between Madison and present-day Medary on the north side of La Crosse in 1873.  This line was difficult to construct, as it crossed through areas of rugged terrain, requiring three tunnels and numerous wooden trestles.  The LCT&P was purchased by the C&NW in 1876.

Soon after completion, this line became an important route for the C&NW.  The line connected an existing mainline to Chicago with the existing W&StP mainline across southern Minnesota.  In addition, the Chicago, St. Paul, Minneapolis & Omaha Railway (Omaha Road, a C&NW subsidiary) mainline ended at this line in Elroy, Wisconsin, providing the C&NW with a connection to the Twin Cities.  Numerous improvements were made in the late 1870s and throughout the 1880s, including filling wooden trestles and replacing wooden bridges with iron and stone.  The C&NW constructed a short 4-mile branch line from Medary to La Crosse in 1886.  By the late 19th Century, traffic over this route had grown to the point that a second track was necessary.  Between 1896 and 1899, the C&NW completed a second track between Evansville, Wisconsin and Elroy.  By the early 20th Century, the C&NW was operating an expansive railroad network throughout the Midwest, radiating north and west from Chicago.  This line initially served as one of the principal mainlines of the railroad, connecting Chicago to the Twin Cities and the mainline to South Dakota.

Between 1910 and 1912, the C&NW undertook a large construction program to construct shorter routes and streamline operations.  A cutoff between Milwaukee and Sparta opened in 1911, reducing the importance of this line.  Between 1953 and 1956, much of the double track would be removed.  A portion of the line was abandoned between Elroy and Sparta in 1964, and became one of the United States first rail-trail projects.  In 1978, the Sparta to Medary and Winona to Trempeleau, Wisconsin segments would be abandoned, followed by the Beloit to Evansville segment in 1979 and the Medary to Trempeleau and La Crosse segments in 1981.  The Reedsburg to Elroy segment was abandoned in 1987.  All of the line west of Reedsburg would be acquired by the Wisconsin Department of Natural Resources for trail use.  

In 1995, the C&NW would be purchased by Union Pacific Railroad (UP).  In 1996, UP leased the Fitchburg to Reedsburg segment to the Wisconsin & Southern Railroad (WSOR).  In addition, UP attempted to abandon the Evansville to Fitchburg segment the same year.  In response to possibly losing railroad service, the communities of Fitchburg and Oregon purchased the line, although it was out of service.  In 2014, the State of Wisconsin acquired the Fitchburg to Reedsburg line, and contionued to lease it to WSOR.  The same year, WSOR began operations over the Oregon to Fitchburg line, while the Evansville to Oregon segment remains out of service.  Today, WSOR operates the Reedsburg Subdivision between Madison and Reedsburg.  The 400 State Trail uses the former railroad between Reedsburg and Elroy; the Elroy-Sparta State Trail uses the former railroad between Elroy and Sparta; the La Crosse River State Trail uses the former railroad between Sparta and La Crosse; and the Great River State Trail uses the former line between Medary and Marshland.  


Located in Ablemans Gorge near Rock Springs, this deck plate girder bridge carries the former Chicago & North Western Railway mainline over the Baraboo River. The first bridge at this location was likely a timber pile trestle, constructed when the railroad was first built. In the late 1870s and 1880s, the C&NW invested significant capital into this line, replacing timber bridges with stone and iron structures. In approximately 1880, the original bridge was replaced with a new iron truss bridge. This bridge likely consisted of riveted double intersection Warren pony truss spans or lattice through truss spans, set onto stone piers and abutments. The trusses were likely constructed by the Leighton Bridge & Iron Works, which fabricated most of the iron spans for the C&NW during this time. When the C&NW double tracked the Baraboo to Elroy segment of this line in 1898-1899, the original bridge was removed and a new bridge constructed. Work on the substructures progressed through the fall of 1898, and the current steel spans were placed in early 1899. It is likely that the old truss spans were reused at another location, although it is unknown where they may have been reused. Currently, the bridge consists of an 81-foot, a 52-foot and a 49-foot deck plate girder spans, set onto stone piers and abutments. The bridge is set onto a sharp curve, and the superstructure is both superelevated and slightly skewed. The superstructure uses a standard design, with heavily constructed girders and an open deck. The substructure also uses a standard design, with diamond shaped piers and abutments constructed with wing walls extending diagonally from the bridge. Lassig Bridge & Iron Works fabricated the girders, while railroad company forces constructed the substructures. While many railroads used company forces to construct stone and concrete bridges, the C&NW often contracted this work. It is unknown why the C&NW decided to use company forces for masonry on this double tracking project. Stone for the substructures was quarried nearby at Ablemans (Rock Springs). Deck plate girder spans were commonly used by railroads, as they were durable and easy to construct. The northern track was removed in approximately 1960, and it is unknown if the girders were reused elsewhere. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this bridge as being locally significant, due to the common design.


Citations

Build date Chicago & North Western Valuation Notes at the Chicago & North Western Historical Society Archives
Builder Missing Lassig Bridge & Iron Works plaque
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele

Loading...