UP Webster Avenue Bridge (Logan Square)


Click the photo to view the full-size version

1/17
Date Taken:
Author:
Caption:

Name UP Webster Avenue Bridge (Logan Square)
Chicago & North Western Railway Bridge #1299
Built By Chicago & North Western Railway
Currently Owned By Union Pacific Railroad
Superstructure Contractor Chicago Bridge & Iron Works of Chicago, Illinois
Substructure Contractor Unknown
Length 70 Feet Total, 25 Foot Main Spans
Width 5 Tracks, 2 In Use
Height Above Ground 11 Feet 6 Inches
Superstructure Design Trough Floor Steel Stringer
Substructure Design Stone Masonry, Concrete and Steel Bent
Date Built 1915
Traffic Count 75 Trains/Day (Estimated)
Current Status In Use
Chicago & North Western Railway Bridge Number 1299
Union Pacific Railroad Bridge Number 3.10
Significance Local Significance
Documentation Date 8/27/2022

In the early 1850s, several railroad companies began constructing railroad lines radiating from Chicago.  In 1855, the Chicago & Milwaukee Railroad (C&M) constructed a 45-mile railroad line, extending north from an existing railroad line at Ashland Avenue and Armitage Avenue in Chicago to the Wisconsin State Line near Kenosha.  At the same time, the Milwaukee & Chicago Railroad (M&C) constructed an additional 40 miles north to Milwaukee.  The two railroads would be consolidated into a new railroad known as the Chicago & Milwaukee Railroad (C&M) soon after completion, and would come under control of the Chicago & North Western Railway (C&NW) in 1866.  The C&M was leased to the Chicago, Milwaukee and North Western Railway (CM&NW) in 1883.  The C&NW acquired control of the CM&NW soon after.   The C&NW had constructed and acquired a large network of railroad lines through the Midwest.  This line formed a portion of the principal north mainline of the C&NW, eventually extending to northern Wisconsin and the Upper Peninsula of Michigan.  Due to increasing traffic along this line, a second track would be constructed between 1890 and 1892.

In the late 19th Century, railroad traffic had become a significant safety hazard for the City of Chicago.  A solution was devised to elevate the railroad tracks throughout the city, placing the railroads upon embankments and constructing subways at each street.  In 1898, the C&NW completed track elevation and a third track from Ashland Avenue to Balmoral Avenue; followed by Balmoral Avenue into Evanston between 1907 and 1910.  The C&NW would become a prominent railroad in the Midwest, eventually building a system over 11,000 miles long.  Throughout the 20th Century, this line would continue to be an integral part of the C&NW system.  The second track would be removed north of Kenosha after 1959.  In 1995, the C&NW would be purchased by the Union Pacific Railroad.  Union Pacific continues to operate the route as the Kenosha Subdivision.  Metra operates a commuter service, the Union Pacific-North Line over the Chicago to Kenosha section.


Located in the Logan Square neighborhood of Chicago, this steel stringer bridge carries the Union Pacific North Line over Webster Avenue west of Ashland Avenue. The railroad was originally elevated at this location in 1899, and the first structure consisted of a through plate girder span, similar to other structures seen on the Union Pacific North Line. In 1915, the railroad decided to replace the structure in conjunction with an upcoming replacement of the Deering Bridge, which is located immediately north of this location. The bridge would be replaced by a structure consisting of two 25-foot and two 10-foot trough floor steel stringer spans, set onto steel bent piers. The stone substructures from the previous bridge would be repaired and reused. This type of bridge utilizes numerous parallel steel stringers and a sheet metal deck, which are constructed as one unit. The bridge was originally constructed for five tracks, although only two remain in use. The superstructure of the bridge was fabricated by Chicago Bridge & Iron Works, and it is believed that the substructures were constructed by railroad forces. This design of bridge was commonly used for track elevation projects, as it provided a durable and cost effective design. In addition, ballast decks were preferred by railroads and municipalities, as they provided a safer design for roadway users and the maintenance was more cost effective than an open deck design. Overall, the bridge appears to be in good condition, and the bridge was repaired and painted in 2018. The author has ranked the bridge as being locally significant, due to the common design.


Citations

Builder and build date Railway Review; Volume 57
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele