Oak Leaf Trail - Milwaukee River Parkway Bridge


Click the photo to view the full-size version

1/12
Date Taken:
Author:
Caption:

Name Oak Leaf Trail - Milwaukee River Parkway Bridge
Chicago & North Western Railway Bridge #1609 1/2
Built By Chicago & North Western Railway
Currently Owned By Milwaukee County
Superstructure Contractor Unknown
Substructure Contractor Unknown
Length 66 Feet Total, 33 Foot Spans
Width 2 Tracks
Height Above Ground 10 Feet 6 Inches
Superstructure Design Concrete Encased Beam
Substructure Design Concrete
Date Built 1950
Traffic Count 0 Trains/Day (Bridge is Open to Pedestrian Traffic)
Current Status Open to Pedestrian Traffic
Chicago & North Western Railway Bridge Number 1609 1/2
Significance Minimal Significance
Documentation Date 6/13/2014; 2/11/2023

In 1873, the Northwestern Union Railway (NWU) constructed 63 miles of new railroad, extending from Milwaukee, Wisconsin to Fond du Lac, Wisconsin.  The NWU was consolidated into the Chicago and Milwaukee Railway (C&M) in 1881.  During 1881, the C&M became part of the Chicago, Milwaukee and North Western Railway (CM&NW), which was purchased by the Chicago & North Western Railway (C&NW) in 1883. At the southern end, the line connected to an existing mainline between Chicago and Milwaukee.  At the north end, the line connected to an existing mainline between Janesville, Wisconsin and Green Bay, Wisconsin.  This line provided the C&NW with a direct connection between Milwaukee and Fond du Lac, shortening the travel time between Chicago and Green Bay.  A large depot was constructed at the end of Wisconsin Avenue along Lake Michigan in 1890.

By the early 20th Century, the C&NW was one of the premiere Midwest railroads, operating an extensive network of lines throughout the area.  This route initially served as a mainline for both freight and passenger service. Bypasses of Milwaukee constructed between 1910 and 1912 allowed freight trains to bypass downtown Milwaukee, instead joining this line at Wiscona, a junction on the north side of Milwaukee.  In 1964, Milwaukee County purchased the Lake Front Depot and surrounding areas for future freeway construction. In 1966, a portion of the line through the Lower East Side of Milwaukee was abandoned, and the depot would be demolished in 1968.  South of Wiscona, this line would continue to be used as an industrial lead, serving a handful of industries.  

In 1988, the C&NW sold the Granville, Wisconsin to Fond du Lac segment of this line to the Fox River Valley Railroad, which became the Fox Valley and Western Ltd. (FV&W) in 1993.  The FV&W was a subsidiary of the successful Wisconsin Central Ltd. (WC), which had acquired a large amount of former Milwaukee Road and Soo Line trackage in Wisconsin.  Also in 1993, the C&NW abandoned the remaining line south of Hampton Avenue, and the right-of-way was acquired for trail use.  The C&NW was purchased by Union Pacific Railroad (UP) in 1995.  A short connection between the WC tracks and the former C&NW line at Fond du Lac was constructed in the late 1990s, and the northern portion of the C&NW line was abandoned.  A portion of the line between south of West Bend and Eden was abandoned in 1998, and also acquired for trail use.  In 2001, WC was purchased by Canadian National Railway (CN), and became the American subsidiary of the railroad.  UP abandoned the line south of Wiscona in 2008, and the railroad was acquired for trail use.  In 2021, CN sold the Granville to West Bend and Eden to Fond du Lac segments of the line to Wisconsin & Southern Railroad (WSOR).  Today, UP operates the Granville Industrial Lead between Wiscona and Granville; WSOR operates the West Bend Subdivision between Granville and West Bend and the Eden Spur between Fond du Lac and Eden.  The former railroad between West Bend and Eden is used as part of the Eisenbahn State Trail, while much of the former railroad between downtown Milwaukee and Wiscona is used as part of the Oak Leaf Trail.


Located on the north side of Milwaukee, this concrete encased beam bridge carries the former Chicago & North Western Railway mainline over Milwaukee River Parkway. In the first half of the 20th Century, Milwaukee County worked to enhance the areas along the Milwaukee River, constructing parks and parkways. A new roadway was constructed along the west bank in 1950, and in response, a new bridge was required to carry the railroad over the roadway. Currently, the bridge consists of two double track 33-foot concrete encased beam spans, set onto concrete substructures. The superstructure appears to have been cast in four sections per span, and was likely constructed off-site. The superstructure also includes an integral walkway, supported by curved concrete brackets. The abutments and piers use a typical 1950s decorative design, with some decorative features. An unknown contractor constructed the superstructure, and an unknown contractor constructed the substructures. Concrete encased beam spans were occasionally used by some railroads, as they were durable, easy to construct and could provide an attractive finish. Since the initial construction, the bridge has seen no significant alterations, and now carries the Oak Leaf Trail. Overall, the bridge appears to be in good condition, with no significant deterioration noted. The author has ranked this bridge as being minimally significant, due to the newer age.


Citations

Build date Wisconsin Department of Transportation Structures Inventory
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele