UP Division Street Bridge (Bloomington)


Click the photo to view the full-size version

1/14
Date Taken:
Author:
Caption:

Name UP Division Street Bridge (Bloomington)
Chicago & Alton Railroad Bridge #125.1
Built By Chicago & Alton Railroad
Currently Owned By Union Pacific Railroad
Superstructure Contractor Unknown
Length 36 Feet Total, 18 Foot Spans
Width 10 Tracks, 5 In Use
Height Above Ground 11 Feet 6 Inches
Superstructure Design Concrete Slab
Substructure Design Concrete
Date Built 1922, Widened 1929
Traffic Count 20 Trains/Day (Estimated)
Current Status In Use
Chicago & Alton Railroad Bridge Number 125.1
Union Pacific Railroad Bridge Number 125.10
Significance Local Significance
Documentation Date 4/2/2023

In 1850, the Alton and Sangamon Railroad began construction on a 220 mile railroad line, extending from Joliet, Illinois to Alton, Illinois; with stations in Bloomington and Springfield, Illinois.  The railroad was acquired by the Chicago, Alton & St. Louis Railroad and completed in 1855.  The Alton and St. Louis Railroad constructed a 22 mile line from Alton to East St. Louis in 1856.  The railroads were reorganized as the St. Louis, Alton & Chicago Railroad in 1857, and was merged into the Chicago & Alton Railroad (C&A) in 1862.  The C&A developed several lines throughout central Illinois, and this route made up the principal mainline of the system.  A bypass of Alton between Godfrey and East St. Louis was constructed in As traffic grew on the system through the 1870s and 1880s, the need for a second track became apparent.  A second track was added in 1870 between Mazonia and Odell, from 1888 to 1893 between Odell and Bloomington, and through Springfield in 1893.  This route became an important route to the Illinois railroad network, providing the most direct connection between St. Louis and Chicago.

Throughout the years, the C&A would be affiliated with several larger railroads, and the railroad primarily operated as a bridge route.  The C&A was reorganized in 1901, and until 1906 was owned by the Atchison, Topeka & Santa Fe Railway and the Chicago, Rock Island & Pacific Railway.  Between Bloomington and Springfield, a second track was constructed in 1907, and a second track was constructed in 1911 between Springfield and East St. Louis.  A large realignment was made between Atlanta and Lawndale in 1924.  In 1931, the C&A would be reorganized as the Alton Railroad (A), a subsidiary of the Baltimore & Ohio Railroad.  The Alton was sold to the Gulf, Mobile & Ohio Railroad (GM&O) in 1949, and the various subsidiaries consolidated at that time.  The GM&O merged with the Illinois Central Railroad to form Illinois Central Gulf (ICG) in 1972.  During the ICG years, the route was downgraded, and the second track mostly removed.  This line was excess for the ICG, and the route would be sold to the Chicago, Missouri & Western Railway (CM&W) in 1987.  The CM&W went bankrupt, and the line was sold to the Southern Pacific Railroad in 1989, which became part of Union Pacific Railroad in 1996.  During the 2010s, the route was rebuilt for high speed rail.  Today, Union Pacific continues to operate this route as the Joliet Subdivision between Joliet and Bloomington, and the Springfield Subdivision between Bloomington and East St. Louis.  High speed Amtrak trains also utilize this route. 


Located in Bloomington, this concrete slab bridge carries the former Chicago & Alton Railroad over Division Street. It is unknown if there was a previous bridge at this location. In 1922, the C&A decided to construct a new concrete underpass at this location, extending the bridge westwards in 1929. The bridge consists of two 18-foot concrete slab spans, set onto concrete substructures. It is believed that an unknown contractor completed this bridge. Typical of bridges from this era, the bridge utilizes a decorative paneling on the slabs, and arches connected by concrete columns for the pier. Numerous examples of this type of bridge were built throughout the United States during the 1920s and 1930s, as it was a durable and easy design to construct. Expansion of the bridge was accomplished by simply adding two additional tracks on to the west end. While the bridge was initially constructed to carry 10 tracks, only 5 remain in use today. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this bridge as being locally significant, due to the common design.


Citations

Build date Illinois Central Gulf Missouri Division 1979 Track Profile
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele

Loading...