Name | UP Wrightwood Avenue Bridge (Lincoln Park) Chicago & North Western Railway Bridge #1301 |
Built By | Chicago & North Western Railway |
Currently Owned By | Union Pacific Railroad |
Superstructure Contractor | Lassig Bridge & Iron Works of Chicago |
Substructure Contractor | Unknown |
Length | 40 Feet Total |
Width | 5 Tracks, 2 In Use |
Height Above Ground | 10 Feet 6 Inches |
Superstructure Design | Through Plate Girder |
Substructure Design | Stone Masonry |
Date Built | 1899 |
Traffic Count | 75 Trains/Day (Estimated) |
Current Status | In Use, Scheduled For Replacement |
Chicago & North Western Railway Bridge Number | 1301 |
Union Pacific Railroad Bridge Number | 3.73 |
Significance | Local Significance |
Documentation Date | 2/26/2023 |
In the early 1850s, several railroad companies began constructing
railroad lines radiating from Chicago. In 1855, the Chicago & Milwaukee Railroad (C&M) constructed a
45-mile railroad line, extending north from an existing railroad line at
Ashland Avenue and Armitage Avenue in Chicago to the Wisconsin State Line near
Kenosha. At the same time, the Milwaukee & Chicago Railroad (M&C) constructed an additional 40 miles north to Milwaukee. The two railroads would be consolidated into a new railroad known as the Chicago & Milwaukee Railroad (C&M) soon after completion, and would come under control of the Chicago & North Western Railway (C&NW) in 1866. The C&M was leased to the Chicago, Milwaukee and North Western Railway (CM&NW) in 1883. The C&NW acquired control of the CM&NW soon after. The C&NW had constructed and acquired a large network of railroad lines through the Midwest. This line formed a portion of the
principal north mainline of the C&NW, eventually extending to northern Wisconsin and the Upper Peninsula of Michigan. Due to increasing traffic
along this line, a second track would be constructed between 1890 and 1892.
This bridge carries the Union Pacific North Line over Wrightwood Avenue east of Clybourn Avenue in the Lincoln Square neighborhood of Chicago. During the late 19th Century, railroad traffic within the City of Chicago posed a serious hazard to the general population. Starting in the mid-1890s, the City of Chicago passed a number of ordinances mandating the elevation of tracks within the city. An ordinance was passed on December 27th, 1897 requiring the elevation of the Wisconsin Division of the C&NW between Sangamon Avenue and Wood Street, and the Milwaukee Division of the C&NW between the Wisconsin Division and Diversey Parkway. Construction began soon after, and was largely completed in 1899. This section required extensive retaining walls, which were constructed with stone.
Built in 1899, the bridge consists of a 40-foot through plate girder span, set onto stone abutments. The girder span is typical of early track elevation projects, consisting of a traditional floor constructed of stringers and floorbeams, covered by a sheet metal deck. In addition, the ends of the girders are a rounted taper, typical of C&NW bridges. The bridge was initially constructed for five tracks, although only two tracks remain in use. Lassig Bridge & Iron Works fabricated the girders for this track elevation project. This company fabricated numerous spans for the C&NW, and had its shop along this line at at the northwest corner of this bridge. However, the industrial lead into the Lassig shops was too sharp to allow the spans for this project to be shipped whole, and the pieces were instead assembled at the division shops before being installed. Stone for the abutments was quarried at a railroad owned quarry near Duck Creek, Wisconsin, and the abutments and retaining walls were constructed by contract.
This type of structure was initially popular for grade separations in Chicago, but fell out of favor as trough floor spans and concrete spans became more economical. The metal floor of this design of bridge was susceptible to pooling water, which would cause corrosion to the steel. In addition, the through girder design limited horizontal clearances on the bridge. In 2011, Metra began a project to replace the bridges between Grace Street and Balmoral Avenue, completing the project in 2020. A second project is planned to replace the bridges between Fullerton Avenue and Cornelia Avenue beginning in late 2024. The bridges will be replaced with new through plate girder spans, installed on new concrete abutments. Overall, the bridge is in poor condition, with significant section loss and deterioration seen throughout the superstructure. The author has ranked this bridge as being locally significant, due to the common design.
Citations
Build date | Chicago & North Western Railway Annual Report |
Builder | Missing Lassig Bridge & Iron Works plaque |
Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |