Name | CN Main Street Bridge (Matteson) Illinois Central Railroad Bridge #28.3 |
Built By | Illinois Central Railroad |
Currently Owned By | Canadian National Railway |
Superstructure Contractor | American Bridge Company of New York |
Substructure Cotnractor | Bates & Rogers Construction Company of Chicago, Illinois |
Length | 60 Feet Total, 30 Foot Spans |
Width | 6 Tracks, 5 In Use |
Height Above Ground | 20 Feet (Estimated) |
Superstructure Design | Concrete Encased Beam |
Substructure Design | Concrete |
Date Built | 1923 |
Traffic Count | 100 Trains/Day (Estimated) |
Current Status | In Use |
Illinois Central Railroad Bridge Number | 28.3 |
Canadian National Railway Bridge Number | 28.3 |
Significance | Local Significance |
Documentation Date | 12/3/2022 |
In 1851, the State of Illinois authorized the construction of a series of railroad lines, extending from Cairo, Illinois; located on the Ohio River, to the Mississippi River at East Dubuque, Illinois and to Chicago, Illinois. The State awarded the Illinois Central Railroad with the land necessary to construct the new lines. In 1852, construction in Chicago, and a short segment was completed to Kensington. The following year, the line would be completed from Kensington to Kankakee, followed by Kankakee to Champaign in 1854. Between 1855 and 1856, the line would be extended to Centralia, where it met the line to East Dubuque. From here, the line would continue south, extending to Cairo. The line was an immediate success, and provided a critical transportation link for the State of Illinois. In addition to connecting Chicago with southern Illinois, the line also connected through several moderate sized towns throughout Central Illinois. Soon after opening, the railroad needed to expand. Prior to 1870, a second track had been constructed from Kensington to Chicago, and a third track was added in 1880. Between 1881 and 1883, the double track would be extended to Kankakee, followed by the section to Gilman in 1890. In 1893, the line was widened to eight tracks between Chicago and 67th Street, as well as to six tracks prior to 1908. Between 1901 and 1902, the railroad double tracked the entire line between Gilman and Centralia. Four tracks were constructed to Matteson in 1911, followed by to Monee in 1923. Between 1920 and 1923, a third track was constructed to Otto. To improve safety, the tracks would be elevated between Hyde Park in Chicago and Matteson between 1893 and 1923.
By the 20th Century, the IC was a respected railroad, operating an extensive railroad network through the central United States. This line continued to serve as the principal mainline for the IC.
Portions of the second main track were removed in the later part of the 20th Century. In 1972, the IC merged with the Gulf, Mobile & Ohio Railroad
(GM&O) to form the Illinois Central Gulf (ICG). In 1988, the ICG was
reorganized as the Illinois Central Railroad (IC). In 1998, IC was purchased by the Canadian National Railway (CN), the current owner of the line. Today, CN continues to operate the Chicago Subdivision between Chicago and Champaign, as well as the Champaign Subdivision between Champaign and Centralia. The line continues to serve as an important mainline for the CN. In addition, Metra offers a commuter service, the Electric District, between Chicago and Matteson.
View an article discussing the construction of this line
Located in Matteson, this concrete encased beam bridge carries the Metra Electric District over Main Street. In the early 1910s, the Illinois Central began planning a large improvement project for the line between Chicago and Richton. Starting in 1915, the line would be reconstructed and elevated, with new stations, underpasses and tracks constructed. In addition, a portion of the line to 159th Street would be electrified for faster and smoother commuter operations. The project would be completed in 1927, and provided state-of-the-art operations to the line. The section through Matteson was elevated in 1922 and 1923, when this bridge was built. This bridge was constructed for six tracks, and five remain in use today.
The bridge consists of two 30-foot concrete encased beam spans, set onto concrete substructures. The pier utilizes a decorative design typically seen on concrete underpasses in urban areas. The spans were fabricated in 1922 by American Bridge Company, and the substructure was constructed by the Bates & Rogers Construction Company. This design of bridge was commonly used by railroads throughout the United States, as it was durable and easy to construct. The outer face of the bridge utilizes a plate girder, likely to protect the structure. Since the initial construction, the bridge has been altered very little. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked the bridge as being locally significant, due to the common design.
Citations
Build date | Illinois Central Railroad Chicago Terminal Division 1942 Track Profile |
Builder (substructure) | Proceedings of the American Society of Civil Engineers; Volume 53 |
Builder (superstructure) | Based on spans from same project |
Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |