Name Iowa State University Horse Tunnel
Chicago & North Western Railway Bridge #566
Built By Chicago & North Western Railway
Currently Owned By Union Pacific Railroad
Contractor Widell Company of Mankato, Minnesota
Length 8 Feet Total
Width 2 Tracks (50 Feet)
Height Above Ground 10 Feet (Estimated)
Superstructure Design Stone Arch Culvert
Substructure Design Stone Masonry
Date Built 1901
Traffic Count 5 Trains/Day (Estimated)
Current Status In Use
Chicago & North Western Railway Bridge Number 566
Union Pacific Railroad Bridge Number 190.32
Significance Local Significance
Documentation Date 7/22/2012; 11/11/2016

In 1856, the Chicago, Iowa & Nebraska Rail Road (CI&N) began construction on a new mainline across Iowa, connecting an existing Galena & Chicago Union Railroad (G&CU) line at Fulton, Illinois to the Missouri River.  To establish construction, a temporary ferry was installed across the Mississippi River at Clinton in 1856.  In 1857, the first 44 miles were completed to Wheatland, Iowa.  The following year, 20 miles were completed to Lisbon, Iowa; and in 1859, an addition 17 miles were completed to Cedar Rapids, Iowa.  In 1861, the Cedar Rapids & Missouri River Railroad (CR&MR) constructed an additional 41 miles to Chelsea, Iowa; followed by 29 miles to Marshalltown, Iowa in 1862.  After pausing in 1863, an additional 29 miles were completed to Nevada, Iowa in 1864, followed by 23 additional miles to Boone, Iowa in 1865. In 1864, both the CI&N and CR&MR were leased by the Chicago & North Western Railway (C&NW). In 1867, the line continued west from Boone, reaching the Missouri River at Council Bluffs, Iowa in 1867.

During the second half of the 19th Century, the C&NW had constructed and acquired a large amount of trackage throughout the Midwest.  This line formed a principal mainline for the C&NW, connecting western railroads at Omaha to the railroad hub of Chicago.  In  1884, the C&IN and CM&MR were formally acquired by the C&NW.  In 1887, the Linn County Railway (LC) constructed a 6-mile cutoff, bypassing Cedar Rapids to the south between Otis, Iowa and Beverly, Iowa.  At the end of the year, the LC was formally acquired by the C&NW.  During the late 19th Century, several other improvements were made to this line.  Between 1890 and 1891, a second track was constructed between Clinton and Lowden, Iowa; and between Libson and the Cedar River bridge.  Between 1893 and 1894, a second track was constructed between Lowden and Lisbon.  A second track was added to the original mainline through Cedar Rapids in 1898, and between 1898 and 1899, a second track was constructed between the Cedar River bridge and the west side of Marshalltown.  In 1901, a second track was completed between Marshalltown and Boone, and new facilities were constructed at Boone. Throughout the 20th Century, the Cedar River bridge remained a gauntlet structure, severely hindering efficient operations.

By the 20th Century, the C&NW was operating an extensive railroad network, which radiated north and west from Chicago.  This line served as the backbone of the C&NW, connecting transcontinental freight and passengers at Omaha to Chicago.  Known as the Overland Route, this line became one of the most significant railroad routes in the United States.  This route saw continuous upgrades during the 20th Century, including significant bridge, rail, tie and signal upgrades.  In 1995, the C&NW was purchased by Union Pacific Railroad (UP).  In 2002, UP constructed a second track at the Cedar River bridge, eliminating a single track bottleneck in the network.  Today, this line remains vital to UP and is still well maintained.  The Clinton to Boone segment is known as the Clinton Subdivision, and remains a heavily used double track mainline.


Located on the north side of the Iowa State University campus in Ames, this stone arch culvert carries a former Chicago & North Western Railway mainline over a sidewalk at Frederiksen Court. It is unclear if there was a previous bridge at this location. If there was a previous bridge, it likely consisted of a small timber pile trestle bridge, constructed to allow horses owned by the University to cross underneath the tracks. Between 1899 and 1902, the C&NW invested significant capital into this line, double tracking the route between Cedar Rapids, Iowa and Council Bluffs, Iowa. In 1901, the present stone arch culvert was constructed to allow horses to cross underneath the tracks. Currently, the bridge consists of an 8-foot stone arch, set onto stone substructures and constructed for two tracks at a width of 50 feet. The structure follows a standard design, with a semicircular arch and stepped wing walls which extend diagonally from the culvert. Stone for the structure consists of a yellow limestone, likely quarried at Mankato, Minnesota. It is believed that the Widell Company constructed the culvert as part of a larger contract for constructing stone bridges and culverts along this line. This firm was reportedly awarded a large contract for the stonework required for double tracking this line, and also received additional contracts for most work along the Iowa Division between 1898 and 1902. Stone arches were popular for railroad use, as they were durable and easy to construct. Since the initial construction, the culvert has seen no significant alterations, and remains in use. Overall, the culvert appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this culvert as being locally significant, due to the common design.


Citations

Build date Chicago & North Western Railway Valuation Notes at the Chicago & North Western Historical Society Archives
Builder The Improvement Bulletin; November 18, 1899
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele