Name UP Des Moines River Bridge (Des Moines)
Chicago, Rock Island & Pacific Railroad Bridge #723
Built By Chicago, Rock Island & Pacific Railway
Currently Owned By Union Pacific Railroad
Superstructure Contractor American Bridge Company of New York
Substructure Contractor Unknown
Length 460 Feet Total, 153 Foot Spans
Width 1 Track
Height Above Ground 20 Feet (Estimated)
Superstructure Design Subdivided Warren Through Truss
Substructure Design Stone Masonry and Concrete
Date Built 1920
Traffic Count 10 Trains/Day (Estimated)
Current Status In Use
Chicago, Rock Island & Pacific Railroad Bridge Number 723
Union Pacific Railroad Bridge Number 72.30
Significance Moderate Significance
Documentation Date 7/21/2012; 11/10/2012; 9/29/2017

In 1871, the Chicago & South Western Railway constructed 61 miles of new railroad between Shearwood, Missouri and Allerton, Iowa, as part of a larger project to construct a line between Leavenworth, Kansas and Washington, Iowa.  In 1873, the Des Moines, Indianola & Missouri Railroad (DMI&M) constructed a 21 mile railroad line, extending from Des Moines, Iowa south to Avon, Iowa; and west to Indianola, Iowa.  Both railroads would be sold to the Iowa Northern & Missouri Southern Railroad in 1876, which was merged into the Chicago, Rock Island & Pacific Railway in 1880.  The Rock Island had acquired and constructed a network of railroads, particularly in Iowa.  This route served as a branch line to a small town near Des Moines.  During the 1880s and 1890s, the Rock Island expanded westwards, reaching Colorado and New Mexico.  Additions to the system during the early 1900s included a number of new lines in Minnesota and northern Iowa.  In 1911, the St. Paul & Kansas City Short Line Railroad, a subsidiary of the Rock Island, constructed 65 miles between Avon, Iowa and Allerton, Iowa; connecting the two lines.  This new line was built as part of a larger project to connect the northern and southern portions of the system. To reach Kansas City, the Rock Island utilized trackage rights over the Chicago, Burlington & Quincy Railroad from Cameron Junction to Kansas City.  In 1931, the Rock Island constructed a new line from near Trenton to Birmingham, located just outside of Kansas City.  From Polo to Birmingham, the route would parallel the Chicago, Milwaukee, St. Paul & Pacific Railroad tracks, and the two railroads operated as a double track route, with separate mainlines.  In 1945, a new bridge across the Missouri River was jointly constructed by the two railroads.

The Rock Island had constructed and acquired a large railroad network throughout the Midwest.  The Kansas City-Des Moines-St. Paul route would become known as the "Spine Line".  After World War II, the Rock Island struggled to survive, proposing mergers and deferring maintenance on their routes.  The Rock Island struggled to compete with a stronger and better constructed Union Pacific system.  By 1964, the Rock Island began attempts to merge with Union Pacific, and restructure railroads west of the Mississippi River.  This merger was eventually denied, and Rock Island turned its last profit in 1965.  In the mid-1970s, the railroad was in serious decline.  The railroad received loans to attempt to fix slow orders, received new equipment and turn a profit.  By 1978, the railroad came close to profit, but creditors were lobbying for a complete shutdown of the Rock Island.  During the fall of 1979, a strike crippled the railroad, and by January of 1980, the entire system was ordered to be shut down and liquidated.  Many of the lines and equipment were scrapped.  Profitable sections of railroad were prepared for sale.  The Chicago & North Western Railway (C&NW) and Soo Line both had interest in the Spine Line, with the C&NW eventually purchasing the route.  During 1982 and 1983, significant money was allocated for rebuilding the deteriorated route, and trains began using the route.  In 1995, C&NW was purchased by Union Pacific Railroad (UP).  Union Pacific continues to operate this route as the Trenton Subdivision.  CPKC now operates the former Milwaukee Road portion of this segment.


Located near Hartford Avenue on the southeast side of Des Moines, this through truss bridge carries a former Chicago, Rock Island & Pacific Railroad (Rock Island) mainline over the Des Moines River. Originally, the "Winterset Branch" reached Des Moines by following present-day Hartford Avenue and Columbus Avenue to 7th Street, where it crossed the Raccoon River on a truss bridge shared by roadway and railroad traffic. By the early 1880s, this arrangement was no longer acceptable to either party, and the Winterset Branch would be realigned. In 1882-1883, a new bridge was constructed at the present location. This bridge consisted of four 153-foot combination Howe through truss spans, set onto stone piers and abutments. It is likely that the bridge was renewed with four iron truss spans in the late 1880s or early 1890s. By the end of the 1910s, the bridge had become too light for traffic, and it was decided to replace it with heavier steel trusses. In late 1919, construction began on replacing the southern three spans with new truss spans, and replacing the northern truss span with timber pile trestle. In the early 1970s, the north approach was filled with embankment and a new overflow bridge was constructed further north, giving the bridge its present configuration.

Currently, the bridge consists of three 153-foot, 6-panel, riveted subdivided Warren through truss spans, set onto stone abutments and piers. The north abutment was rebuilt with a concrete backwall when the north approach was filled. The truss spans follow a standard Rock Island design for the era, with heavy built-up members, a standard floor and heavily constructed portal bracing. Both the top chord and endposts use a heavily built-up design, and are composed of two U-shaped channels joined by a solid plate on the exterior and X-lacing on the interior. The bottom chord is similarly composed, but uses X-lacing on both sides. All vertical members are composed of solid beams, while all diagonal members are composed of heavy X-laced beams. The floor is composed of plate girder floorbeams and plate girder stringers, and the lower lateral bracing is composed of standard steel bars. The portal bracing uses a standard Rock Island design, with two bays of subdivided "X" shapes and diagonal beams forming the heel bracing. All portions of the portal bracing are formed from heavy X-laced beams. The sway bracing uses a standard double intersection lattice design, which is formed from L-shaped bars. The upper lateral bracing is formed from V-laced beams. Both piers and the main portion of the north abutment use a standard diamond shaped design, while the south abutment uses a standard U-shaped design. The north abutment has been retrofitted with a sloped concrete backwall, and the remaining piers and south abutment were repaired with concrete when the bridge was constructed. Stone for the substructures consists of a tan limestone, possibly quarried near Earlham, Iowa.

American Bridge Company fabricated the superstructure, while the substructure was constructed by an unknown contractor. It is unclear if the concrete alterations to the substructure were completed by railroad company forces or by an unknown contractor. Subdivided Warren trusses became popular with some railroads in the 1910s and early 1920s. These spans allowed for greater strength than traditional Warren spans, while still maintaining a relatively simple design. The design is similar to a Baltimore truss span, although it maintains a Warren base configuration. Many similar bridges were constructed for the Rock Island system, and several spans remain intact today. Since the initial construction, the bridge has seen a number of alterations. Both piers and the north abutment have been reinforced with sheet piling and concrete at the base. In addition, the trusses have been strengthened with high strength bolts at some connections. Today, the bridge remains in regular use as part of a Union Pacific Railroad mainline. Overall, the bridge appears to be in fair to good condition, and appears to be well maintained. The author has ranked this bridge as being moderately significant, due to the truss design.


Citations

Build date Railway Maintenance Engineer; Volume 15, Issue 11
Builder (superstructure) Missing American Bridge Company plaque
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele