UP Tyler Creek Bridge (West)


Click the photo to view the full-size version

1/8
Date Taken:
Author:
Caption:

Name UP Tyler Creek Bridge (West)
Chicago & North Western Railway Bridge #355
Built By Chicago & North Western Railway
Currently Owned By Union Pacific Railroad
Superstructure Contractor Unknown
Substructure Contractor Unknown
Length 25 Feet Total
Width 1 Track
Height Above Ground 20 Feet (Estimated)
Superstructure Design Steel Stringer
Substructure Design Stone Masonry Concrete
Date Built c. 1930
Traffic Count 2 Trains/Day (Estimated)
Current Status In Use
Chicago & North Western Railway Bridge Number 355
Union Pacific Railroad Bridge Number 46.99
Significance Local Significance
Documentation Date 3/13/2022

In 1836, the Galena and Chicago Union Railroad (G&CU) was charted to construct a railroad line between Chicago and Galena, Illinois.  After attempts to construct the railroad in the late 1830s, the company came to a halt due to lack of funds.  William B. Ogden was elected director of the G&CU in 1847, and construction on the railroad began in 1848.  That year, the first four miles to present day Oak Park were constructed.  In 1849, the railroad reached Turner Junction (West Chicago), thirty miles west of downtown Chicago.  By the end of 1850, the railroad had reached Elgin, and in 1852, the railroad would reach Rockford.  In 1853, the line would be extended to Freeport, Illinois; where it connected to the Illinois Central Railroad.  The G&CU realized the company would be better served by constructing a mainline west towards Iowa, and never extended the line past Freeport.  In total, the line would be 121 miles in length.  The G&CU was consolidated with the Chicago & North Western Railway (C&NW) in 1864.  The C&NW was beginning to construct and acquire a large network of railroads throughout the Midwest.  The West Chicago to Freeport line formed a secondary route, connecting industries to Chicago.

Through the 20th Century, this route began to decline in significance.  The C&NW would become a prominent railroad in the midwest, eventually building a system over 11,000 miles long.  By the 1970s, industries had closed and passenger traffic disappeared.  In 1981, the C&NW would abandon the segment between Rockford and Freeport.  The right-of-way would be purchased by Commonwealth Edison, and portions of the line converted to the Pecatonica Prairie Path.  In 1995, the C&NW would be purchased by the Union Pacific Railroad.  Today, Union Pacific operates the West Chicago to Rockford segment as the Belvidere Subdivision, which mainly serves the Stellanis Plant in Belvidere.  Metra service is scheduled to begin to Rockford in 2027, and utilize this line between Elgin and Rockford.  West of Rockford, much of the route has become part of the Pecatonica Prairie Path. 


Located on the west side of Elgin, this steel stringer bridge carries the former Chicago & North Western Railway over Tyler Creek. The first bridge at this location was likely a timber pile trestle. In 1897, the bridge would be reconstructed with a 25-foot deck plate girder span, set onto stone abutments. The bridge was again upgraded in approximately 1930, when the girder span was replaced with a steel stringer, and the abutments repaired with concrete. Currently, the bridge consists of a 25-foot steel stringer span, set onto stone and concrete abutments. The stringer utilizes a standard design for the era, and consists of an open deck. Upon construction of the current bridge, the original limestone abutments were partially encased with concrete. It is currently unknown what contractors fabricated the superstructure and constructed the abutments. This design of bridge was commonly used by railroads, as it was durable and easy to construct. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this bridge as being locally significant, due to the common design.


Citations

Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele

Loading...