Name | UP Deerpath Road Bridge Chicago & North Western Railway Bridge #262 1/2 |
Built By | Chicago & North Western Railway |
Currently Owned By | Union Pacific Railroad |
Superstructure Contractor | American Bridge Company of New York |
Substructure Contractor | Bates & Rogers Construction Company of Chicago, Illinois |
Length | 51 Feet Total |
Width | 2 Tracks |
Height Above Ground | 14 Feet 1 Inches |
Superstructure Design | Through Plate Girder |
Substructure Design | Concrete |
Date Built | 1937 |
Traffic Count | 10 Trains/Day (Estimated) |
Current Status | In Use |
Chicago & North Western Railway Bridge Number | 262 1/2 |
Union Pacific Railroad Bridge Number | 29.03 |
Significance | Local Significance |
Documentation Date | 7/8/2018 |
In the late 19th Century, Chicago grew to the prominent railroad hub in
the central United States. Chicago also served as the dividing point
between the railroads operating in the east and railroads operating in
the Midwest. The Chicago & North Western Railway (C&NW) had constructed a network of railroad lines, radiating north and west from Chicago. Until a freight bypass was constructed in 1889, all freight traffic from Wisconsin was required to enter downtown Chicago. In the early 20th Century, the C&NW invested heavily in rebuilding existing lines, opening new lines and improving operations. In 1903, subsidiary Chicago Northern Railway Company (CNR) constructed 22 miles of double track railroad between the Mayfair-Evanston freight bypass at River Junction (present day Bryn Mawr Avenue), northwards into Lake County, before turning east to reach the existing C&NW mainline at Lake Bluff, Illinois. Further double track extensions came in 1905-1906, when the Chicago & State Line Railway constructed 16 miles between Tower KO (Lake Forest) and the Wisconsin state line; and the Milwaukee & State Line Railway constructed 34 miles between the state line and St. Francis, Wisconsin; where it joined the existing C&NW mainline between Chicago and Milwaukee. Also in 1908, the C&NW constructed a short 2.3 mile double track line between St. Francis, Wisconsin and the existing C&NW mainline between Milwaukee and Madison at Chase (South Milwaukee). The two railroads were formally consolidated into the C&NW in 1909.
Another double track line was constructed beginning in 1911. Subsidiary Des Plaines Valley Railway (DPV), constructed 11 miles of railroad connecting the Proviso Yard, located east of Elmhurst, to the Wisconsin Division mainline near Des Plaines. The following year, an additional 10 miles were completed to Valley, located in present-day Northbrook. In addition, the Milwaukee, Sparta & North Western Railway (MS&NW) constructed a short 8-mile double track line between the existing C&NW mainlines at Butler, Wisconsin and West Allis, Wisconsin in 1911. It is believed that the C&NW double tracked the existing line between West Allis and Chase at this time. The MS&NW was formally merged into the merged into the C&NW in 1912, followed by the DPV in 1913. The route from St. Francis to Proviso formed a second freight bypass of Chicago, allowing freight from Wisconsin to reach the hump yard at Proviso. This cutoff became a critical portion of the C&NW network, providing a bypass of Chicago and a main way to reach the Proviso Yard from all three principal mainlines of the railroad. The line between Butler and West Allis provided a bypass of Milwaukee, improving operations in the area.
The C&NW would become a prominent railroad in the Midwest,
eventually building a system over 11,000 miles long. Portions of this route were relocated in 1954 to accommodate an expansion of O'Hare International Airport. Much of the second track between Gurnee and St. Francis would be removed in 1960. By 1968, deteriorated track conditions between Dempster Street and Valley resulted in the C&NW acquiring and operating the parallel Chicago, North Shore & Milwaukee Railway trackage. In 1988, the C&NW abandoned the tracks between Oakton Street in Skokie and River Junction. In 1995, the
C&NW would be purchased by the Union Pacific Railroad. UP abandoned the Skokie to Valley segment in 2004. Today, UP continues to operate the Milwaukee Subdivision between Proviso and Butler, and it continues to provide a critical freight route around Chicago.
Located in Lake Forest, this through plate girder bridge carries the former Chicago & North Western Railway over Deerpath Road. In the 1930s, the Illinois Department of Public Works worked to improve roadways throughout the state. One such project was the construction of a grade separation in Lake Forest, with new bridges carrying the busy railroad lines over US Route 41 and Deerpath Road. Work on the project was let in 1936, with American Bridge Company receiving the contract for the superstructure, and Bates & Rogers construction Company was awarded the contract for the substructure. This bridge, and the parallel Chicago, North Shore & Milwaukee Railroad bridge were constructed in 1937. This bridge has remained largely unchanged since. Currently, the bridge consists of a 51-foot double track through plate girder span, set onto concrete substructures. Concrete arch fascia girders have been installed, hiding the steel span. Typical of structures from this era, the bridge utilized a number of decorative features, including decorative abutments, the fascia girder and numerous imprints. This type of bridge was popular for grade separations, as it was durable, economical and easy to construct. Overall, the bridge appears to be in fair condition, with some spalling noted throughout the bridge. The author has ranked this bridge as being locally significant, due to the common design.
Citations
Builder and build date | Railway Age; Volume 101, Issue 5 |
Builder (superstructure) | The Bridgemens Magazine; Volume 36 |
Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |