| Name | CN Wolf Creek Bridge (La Porte City) Chicago, Rock Island & Pacific Railroad Bridge #1356 |
| Built By | Burlington, Cedar Rapids & Northern Railway Chicago, Rock Island & Pacific Railroad |
| Currently Owned By | Canadian National Railway |
| Superstructure Contractor | Unknown (Main Span) Unknown (Approach Spans) |
| Substructure Contractor | Unknown |
| Length | 198 Feet Total, 80 Foot Main Span |
| Width | 1 Track |
| Height Above Ground | 15 Feet (Estimated) |
| Superstructure Design | Through Plate Girder and Steel Stringer |
| Substructure Design | Stone Masonry, Concrete and Steel Pile |
| Date Built | 1902, Approach Constructed 1972 |
| Traffic Count | 4 Trains/Day (Estimated) |
| Current Status | In Use |
| Chicago, Rock Island & Pacific Railroad Bridge Number | 1356 |
| Significance | Local Significance |
| Documentation Date | 5/26/2018; 12/27/2019 |
In 1870, the Burlington, Cedar Rapids & Minnesota Railway (BCR&M) began construction on a new railroad line, constructing 41 miles from Burlington, Iowa north to Columbus Junction, Iowa. The following year, the railroad was completed an additional 116 miles through Cedar Rapids, Iowa to Waterloo, Iowa. In 1872, an additional 64 miles was completed to Plymouth, Iowa. Work on the line resumed in 1877, when the Burlington, Cedar Rapids & Northern Railway (BCR&N) completed an additional 5 miles to Manly, Iowa. In 1878, the BCR&M became part of the BCR&N, completing a diagonal mainline from far southeast Iowa to north central Iowa. By the 1880s, the BCR&N had become an important railroad in Iowa, connecting towns and cities in southeast Iowa to northern Iowa. This line formed the principal mainline of the company, allowing for the construction of many additional branch lines. By the turn of the 20th Century, the BCR&N operated over 1,000 miles of track throughout Iowa, connecting both small towns and large cities. This line also served the basis of a northern extension to St. Paul, Minnesota; which was constructed between 1900 and 1901. In June 1903, the BCR&N was acquired by the Chicago, Rock Island & Pacific Railway (Rock Island), which operated a large railroad network through the central United States. By acquiring the BCR&N, the Rock Island greatly expanded its service area, reaching major hubs such as St. Paul and Sioux Falls, South Dakota.
The Rock Island struggled financially throughout much of its history, experiencing repeated bankruptcies and chronic instability. After World War II, the Rock Island struggled to survive, proposing mergers and deferring maintenance on their routes. The railroad reorganized as the Chicago, Rock Island & Pacific Railroad in 1948. Despite the financial troubles, the Rock Island continued to use this route as a mainline, connecting to major agricultural areas in northern Iowa. By the mid-1970s, the railroad was in serious decline. The railroad secured loans to eliminate slow orders, acquired new equipment, and attempted to restore profitability. In 1978, the railroad came close to profit, but creditors were lobbying for a complete shutdown of the Rock Island. During the fall of 1979, a strike crippled the railroad, and by January of 1980, the entire system was ordered to be shut down and liquidated. Many of the lines and equipment were scrapped. Profitable sections of railroad were prepared for sale. In 1981, a group of grain elevators along the route formed a short line railroad to operate over the bankrupt line.
In 1981 and 1982, the railroad was rehabilitated for use, and the route reopened for service. In 1984, the Iowa Northern Railway (IANR) purchased the line. A derailment near Burlington in 1985 caused the abandonment of much of the line south of Cedar Rapids, with only a small segment at Columbus Junction being sold to the Soo Line, which was controlled by Canadian Pacific Railway (CP) that year. In the late 20th Century, the IANR became a profitable railroad, serving a variety of agricultural industries between Cedar Rapids and Manly. A short segment of the line in Waterloo was abandoned in 1988, as the IANR had acquired trackage rights on a different line. In 1994, IANR was sold to Iron Road Railways (IRR), a holding company. In 1997, CP would sell the line segment to I&M Rail Link, which was later purchased by the Dakota, Minnesota & Eastern Railroad (DM&E) subsidiary Iowa, Chicago & Eastern Railroad (IC&E). After the bankruptcy of the IRR in 2003, the IANR was purchased by a former director of IRR, and grew considerably into a significant regional railroad.
The DM&E/IC&E were purchased by Canadian Pacific in 2008, and the line at Columbus Junction abandoned shortly after due to a bridge collapse during the 2008 floods. In 2025, the IANR was purchased by Canadian National Railway (CN), which already operated a significant railroad network in northern Iowa. This was considered a somewhat unusual example of a large class-one railroad purchasing a short line with the intention of further growing business. At the time of purchase, the IANR not only owned the Cedar Rapids to Manly mainline, but also operated branch lines to Oelwein and Forest City. Today, CN operates the Cedar Rapids Subdivision between Cedar Rapids and Waterloo; and the Manly Subdivision between Waterloo and Manly. South of Cedar Rapids, portions of the line have become part of the Hoover Nature Trail, while other sections are outright abandoned.
Located in La Porte City, this through plate girder bridge carries a former Chicago, Rock Island & Pacific Railroad (Rock Island) mainline over Wolf Creek. The first bridge at this location was likely a timber pile trestle, constructed when the line was first built. This bridge was likely replaced by a wooden or combination truss bridge in the late 1870s or early 1880s. Starting in the mid-1880s, the BCR&N invested significant capital into their system, replacing timber bridges with iron and stone structures. In early 1902, the previous bridge was replaced with a short through truss span, set onto stone abutments. This span consisted of a 118-foot, 5-panel, pin-connected Pratt through truss span with a lattice style portal bracing. During a devastating flood in the summer of 1902, the abutments of the bridge were undermined and the truss span collapsed. It is believed that the creek also carved a new channel immediately south at this time. After the flood, the truss span was repaired, new substructures were constructed and an additional through plate girder span was added at the south end of the bridge. By the 1970s, the truss span was in poor condition and required replacement. In 1972, the truss span was replaced by the present steel stringer spans, giving the bridge its present configuration.
Currently, the bridge consists of an 80-foot through plate girder span, approached by three 39-foot steel stringer spans on the north end. The bridge is set onto a combination of stone, concrete and steel pile substructures. The main span follows a standard design, with two heavy plate girders, a standard floor system and rounded and tapered girder ends. Each of the approach spans also follows a standard design, with four welded beams spaced equally. Both abutments use a standard BCR&N design, with stepped wing walls that extend diagonally from the bridge. The north abutment was encased in concrete in 2025. The south pier uses a standard diamond shaped design and is constructed of stone, while the north approach piers use steel piles with concrete caps. In addition, the south pier was capped with concrete, likely in the early to mid 20th Century. Stone for the bridge consists of cut tan limestone, likely quarried at Cedar Valley, Iowa. An unknown contractor fabricated the south span, and an additional unknown contractor fabricated the north approach spans. It is unclear if the abutments and south pier were constructed by railroad company forces or by an unknown contractor. It is believed that the north approach piers were constructed by railroad company forces. Through plate girder and steel stringer spans were popular for railroad use, as they were durable and easy to construct. Since the 1972 alterations, the bridge has seen only minor changes, namely the encasement of the north abutment in concrete. Today, the bridge remains in use as part of a Canadian National Railway secondary line. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this bridge as being locally significant, due to the common design. If the truss span was still intact, this bridge would have received a higher rating.
Citations
| Build date (main span) | Date carving |
| Build date (approach spans) | Progress Review (La Porte City, Iowa); September 27, 1972 |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |